An LED vapor-tight fixture IES file describes how a specific luminaire distributes light. It lets a project team model the task surface before placing an order. Ask for the file for the exact quoted configuration, then compare proposed layouts using the same geometry and calculation settings.
Match the file to the quotation
Record the model, optic or diffuser, nominal output and mounting orientation. Ask the supplier to identify the file revision and any differences between tested and quoted configurations. A file for a clear diffuser can produce a different modelled result from one for a frosted diffuser, even when both housings fit the same bracket.

Give the lighting designer the mounting height, aisle widths, workplane heights and obstructions. Include racks and machinery that block light. Agree where the calculation grid starts and ends, and keep reflectance and maintenance assumptions consistent when comparing offers.
Compare the lowest readings as well as the average
| Illustrative result for the same workplane | Layout A | Layout B |
|---|---|---|
| Average illuminance | 250 lx | 250 lx |
| Minimum illuminance | 75 lx | 150 lx |
| Minimum divided by average | 0.30 | 0.60 |
The figures illustrate how the same average can mask a darker area. They are not targets or claimed product performance. Check the contour plot to see whether the darkest cells fall at an aisle end, beside a rack or at a workbench. A single minimum figure does not show the position or extent of the dark area.

Keep mounting changes visible
Ask the designer to rerun the model when a duct forces a row to move or an installer changes the mounting height. For example, a layout modelled at 4 m and installed at 4.5 m needs review before anyone relies on its point values. The effect depends on the optics, position and room geometry.
For a project with both aisles and inspection benches, request separate grids. See the warehouse vapor-tight lighting guide for the operating zones and use the dusty workshop guide to identify obstructions and maintenance access.

Make the IES file part of the purchase record
Send the room plan and target values with the RFQ. Ask for the exact fixture code, IES file, calculation summary, layout drawing and a list of deviations. Keep those files with the approved sample. If an optic or output changes before shipment, ask for the affected calculation to be updated before accepting the substitution.